Minute Order Granting Extension of Time is listed in the validated stamped-record Bates log for 1:26-cv-01077. The source is identified as Canonical stamped source: stampedcorpus/doc48.pdf.

This entry is indexed as a court-generated action. The stamped artifact establishes the text and filing record preserved in the master; the page does not enlarge that disposition beyond what the document says.

Integrity reference: 6f510286451f7270de5091c37dc0d0381007de39f5e817b43736e209618187df. Bates range: LCH-000263–LCH-000263.